• Skip to main content
  • Skip to primary navigation
  • Departments
    • Bioengineering
    • Civil and Environmental Engineering
    • Electrical Engineering and Computer Sciences
    • Industrial Engineering and Operations Research
    • Materials Science and Engineering
    • Mechanical Engineering
    • Nuclear Engineering
    • Aerospace program
    • Engineering Science program
  • News
    • Berkeley Engineer magazine
    • Social media
    • News videos
    • News digest (email)
    • Press kit
  • Events
    • Events calendar
    • Commencement
    • Homecoming
    • Cal Day
    • Space reservations
    • View from the Top
    • Kuh Lecture Series
    • Minner Lecture
  • College directory
  • For staff & faculty
Berkeley Engineering

Educating leaders. Creating knowledge. Serving society.

  • About
    • Facts & figures
    • Rankings
    • Mission & values
    • Equity & inclusion
    • Voices of Berkeley Engineering
    • Leadership team
    • Milestones
    • Buildings & facilities
    • Maps
  • Admissions
    • Undergraduate admissions
    • Graduate admissions
    • New students
    • Visit
    • Maps
    • Admissions events
    • K-12 outreach
  • Academics
    • Undergraduate programs
    • Majors & minors
    • Undergraduate Guide
    • Graduate programs
    • Graduate Guide
    • Innovation & entrepreneurship
    • Kresge Engineering Library
    • International programs
    • Executive education
  • Students
    • New students
    • Advising & counseling
    • ESS programs
    • CAEE academic support
    • Student life
    • Wellness & inclusion
    • Undergraduate Guide
    • > Degree requirements
    • > Policies & procedures
    • Forms & petitions
    • Resources
  • Research & faculty
    • Centers & institutes
    • Undergrad research
    • Faculty
    • Sustainability and resiliency
  • Connect
    • Alumni
    • Industry
    • Give
    • Stay in touch
  • Facts & figures
  • Rankings
  • Mission & values
  • Equity & inclusion
    • Students
    • Graduate students
    • Faculty
    • K-12 outreach
  • Voices of Berkeley Engineering
  • Leadership team
    • Meet Dean Liu
    • Engineering Advisory Board
  • Milestones
  • Buildings & facilities
    • Space reservations
    • 2020 Facilities Master Plan
    • Building emergency information
  • Maps
Home > About > Buildings & facilities > Engineering Center > Grimes Engineering Center construction updates > Gallery

Engineering Center construction gallery

See the construction update page for the latest project details.

  • Installing formwork for west plaza stairs
    Installing formwork for west plaza stairs
  • Steel structure rising on upper level
    Steel structure rising on upper level
  • Metal structure of interior walls on lower level
    Installation of priority walls on lower level.
  • Steel framework upper levels, with Davis Hall in background
    Steel framework on upper level
  • Layout marked on ground for west plaza stairs
    Layout for west plaza stairs
  • Steel columns and beams being installed
    Installation of steel frame on upper level
  • Air ducts in basement
    Air ducts installed on lower level
  • Steel brace attached to beam
    Brace attached to rising steel structure
  • Terrace where crane will be installed
    Preparation for mobilization of crane
  • Ductwork reinstalled in basement
    Continuing reinstallation of basement ductwork
  • Workers in trench to reroute underground water valve
    Rerouting water valve by west side stairs
  • Worker installing new ductwork in basement
    Installing mechanical ductwork in basement
  • Installing embed plates at edge of terrace
    Installing embed plates at edge of terrace
  • Overhead scaffolding to protect pedestrians on walkway
    Overhead scaffolding to protect pedestrians on walkway
  • Partially rebuilt casework in library
    Rebuilding casework in library
  • Plastic sheeting over wall openings and concrete floor
    Installation of temporary weather walls
  • Concrete removed around subfloor devices on lower level
    Backfill and compaction of lower-level trenches
  • Fiber-reinforced polymer installed on terrace level
    Fiber-reinforced polymer installed on terrace level
  • Installation of temporary waterproofing on ground level
    Installation of temporary waterproofing on ground level
  • Partially removed ductwork and other equipment
    Demolition of existing mechanical equipment
  • Yellow posts to support crane
    Installation of shoring for crane in library
  • Wall embeds and anchoirs installed on edge of terrace
    Installation of wall embeds and anchors
  • Saw cuts in concrete floor for Engineering Center
    Saw cutting, lower level
  • Fiber-reinforced polymer applied on the lower level
    Fiber-reinforced polymer application
  • Fiber-reinforced polymer applied to the terrace level
    Fiber-reinforced polymer applied to the terrace level
  • Floor adhesive removed, ground level
    Floor adhesive removed, ground level
  • Architectural detail demolition
    Architectural detail demolition
  • Hanging plastic sheeting and uncovered ceiling in Garbarini Lounge
    Removal of shoring in Garbarini Lounge
  • Application of fiber-reinforced polymer on terrace level
    Application of fiber-reinforced polymer
  • Removal of waterproofing on terrace level
    Removal of waterproofing
  • Interior concrete pour
    Concrete pour
  • Anchor bolts atop concrete wall, with McLaughlin Hall in background
    Installation of anchor bolts
  • Formwork for stairs
    Ground-level formwork for stairs
  • Slurry for library footing
    Slurry for library footing
  • Installation of formwork for new beam
    Installation of formwork for new beam
  • New concrete on terrace level
    Concrete pour for terrace ramps
  • Trench in gound showing sewer opening
    Civil work on west boundary
  • Elevator shaft construction
    Elevator shaft construction
  • Strengthening pilasters
    Strengthening pilasters
  • Deconstruction of Sibley Auditorium flooring
    Deconstruction of Sibley Auditorium flooring
  • Elevator foundation
    Elevator foundation
  • Mechanical room wall demolition
    Mechanical room wall demolition
  • Demolition of east oculus
    Demolition of east oculus
  • Installing rebar on PT beams
    Installing rebar on PT beams
  • Preparing beams for strengthening
    Preparing beams for strengthening
  • Cleared terrace level, looking southwest toward Memorial Glade and the Campanile
    Cleared terrace level, looking southwest
  • Excavation for footings
    Excavation for footings in library area
  • Cleared terrace level, looking southwest toward Memorial Glade and the Campanile
    Cleared terrace level, looking southwest
  • Roughening beams in preparation for strengthening
    Roughening beams in preparation for strengthening
  • Mobile rig to drill elevator bore holes
    Mobile rig to drill elevator bore holes
  • Stairs removed from terrace level
    Demolition of terrace-level stairs
  • Preparation for beam strengthening
    Preparation for beam strengthening
  • Applying shotcrete to external wall
    Applying shotcrete to external wall
  • Preparation for beam strengthening
    Preparation for beam strengthening
  • Demolition of southeast staircase from terrace
    Demolition of southeast staircase
  • Preparation for beam strengthening
    Preparation for beam strengthening
  • Doweling for first-floor shear wall
    Construction of shear wall on first floor
  • View from above of lower level shear wall placement with rebar visible.
    Lower level shear wall placement
  • Shoring for lower-level work
    Shoring for lower-level work
  • Demolition work at edge of terrace
    Demolition work at edge of terrace
  • Shoring and conveyor belt for shear wall
    Shoring and conveyor belt for shear wall
  • Rebar cage for expansion of footings
    Rebar cage for expansion of footings, Engineering Center reconstruction
  • Removal or topping slab on south side of project area
    Removal of exterior topping slab
  • Demolition of existing elevators, ground-level view
    Demolition of existing elevator shafts
  • Overview of project from atop McLaughlin Hall, showing cleared spaces and backhoes removing debris
    Project overview from atop McLaughlin Hall
  • Deck surface preparation on terrace level
    Deck surface preparation
  • Heavy machinery demolishing portion of Bechtel Center terrace
    Demolition of terrace level
  • Cleared space on south side of Bechtel, with skylight protruding
    Cleared space on south side of Bechtel, with skylight protruding
  • Cleared terrace area, with only half-walls and railings remaining
    Cleared terrace area, with only half-walls and railings remaining
  • Christian Lander leads a tour of the Engineering Center construction site
    Christian Lander (B.S.’23 CE) leads a tour of the Engineering Center construction site. (Photo by Adam Lau / Berkeley Engineering)
  • A construction worker in a hard hat and bright orange vest holds up a piece of fencing.
    Buckle up, construction is about to begin on the new Engineering Center! Here’s a glimpse of workers putting up fencing around the site.
  • A distant shot of construction on the Bechtel Terrace for the Engineering Center.
    Here’s a glimpse of the construction for the Engineering Center!
  • Dean Liu stands at a lectern in front of a rendering of the new Engineering Center, holding up her left fist in a cheer.
    Tsu-Jae King Liu, dean of engineering, stands in front of a rendering of the new Engineering Center at Cal Day. (Photo by Adam Lau/Berkeley Engineering)
  • College leaders and students shoveling at the Engineering Center groundbreaking ceremony
    Groundbreaking ceremony for the new Engineering Center at UC Berkeley in Berkeley, Calif. on Friday, April 21, 2023. (Photo by Adam Lau/Berkeley Engineering)
  • A rendering of a view of the Campanile from the Engineering Center's balcony.
    Immerse yourself in our new Engineering Center, coming in 2025!
  • An artistic rendering of the Engineering Center.
    Sustainability is the backbone of the reimagined Engineering Center that opens in 2025.
  • Artist's rendering of the central atrium in the Engineering Center
    Artist’s rendering of the central atrium in the Engineering Center
  • Artist's concept of new Engineering Student Center at dusk
    Artist’s concept of new Engineering Student Center at dusk
  • Basement level with priority walls under construction and a construction lamp on
  • Construction of metal decking and mechanical enclosure under construction
  • Metal stairs construction site outside
  • Dean Tsu-Jae King Liu in protective and a high vis vest, signing a steel beam
  • Construction workers standing as a pine tree is put on top of buildings under construction for the topping celebration
  • Contact
  • Give
  • Privacy
  • UC Berkeley
  • Accessibility
  • Nondiscrimination
  • instagram
  • X logo
  • linkedin
  • facebook
  • youtube
© 2025 UC Regents